We currently operate the Alto Valle Thermal Power Plant in the province of Neuquén, and hold equity stakes in the San Martín, Belgrano and Vuelta de Obligado thermal plants in the province of Buenos Aires. We also have offices in the City of Buenos Aires and in the city of Neuquén, and we maintain a solid and committed presence in every area where we operate.
Buenos Aires
Corporate Offices
City of Buenos Aires
Non-Operated Thermal Power Plants
Manuel Belgrano Thermal Power Plant
Installed Capacity: 837 MW
San Martín Thermal Power Plant
Installed Capacity: 823 MW
Vuelta de Obligado Thermal Power Plant
Installed Capacity: 840 MW
Neuquén
Operations Offices
City of Neuquén
Operated Thermal Power Plants
Alto Valle Thermal Power Plant
Installed Capacity: 96 MW
Chubut & Santa Cruz
Operations Offices
City of Comodoro Rivadavia
Drilling, Workover & Pulling Services
27 Rigs
- 11 Workover Rigs
- 15 Pulling Rigs
- 1 Flush-By Unit
Do you have an energy project?
Discover our solutions for generation, marketing and consulting.